Click on any job in this list or scroll down the page to view all
Click
here for UK Piping vacancies
Project
Manager - Nigeria - Job No. 2637 Listed 17/1/12
Deputy
Project Manager - Nigeria - Job No. 2497 Listed 17/1/12
Site
Manager/Construction Manager - Nigeria - Job No. 2536 Listed 17/1/12
Pipeline
Spread Superintendent - Nigeria - Job No. 2498 Listed 21/12/11
Project
Engineering Manager - Nigeria - Job No. 2624 Listed 21/12/11
Field
Engineering Manager - Nigeria - Job No. 2499 Listed 21/12/11
Field Engineer - Nigeria - Job No. 2625 Listed 21/12/11
Back to Top
|
|
Project
Manager - Nigeria - Job No. 2637 Listed 17/1/12
Pipeline experience essential
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY GBP 500 per day worked
OVERTIME Included in the monthly rate
ACCOMMODATION Single Accommodation provided by company together with
full boarding
TRANSPORTATION Rotational flights provided by company (economy)
INSURANCE D&D USD 300’000
LIFE INSURANCE USD 200’000
MEDICAL Worldwide Medical Protection
Please note that candidate has to be mandatory experienced in Pipeline
projects.
Direct hiring experience with contractors
Not working for Clients or as Consultant
Direct hiring experience with contractors needed.
ROLE
DESCRIPTION
Family
Co-ordinates the execution of the Construction activities, procedures,
flow of information and interfaces within the specified area of
competence, ensuring Company economic and strategic results and the
observance of HSE and Quality procedures and practices.
1. Maintains relationship with the Project Teams, other Departments and
Clients (as the case may be) operating in the field of expertise he's in
charge of.
2. Collaborates with the Commercial Function during the estimating,
tendering and budgeting phase and require assistance from Commercial
Department during construction for contract interpretation.
3. Draws up the Projects’ schedule and the Construction strategy
within the specified area of competence and identify human resources and
equipment requirements. Defines the time and costs required for
fulfilment of established objectives.
4. Co-ordinates Construction execution activities and constantly monitor
economic-operative progress by analysing any deviations from the program
and implementing the necessary corrective action, providing support to
the Project Manager and Project Director.
5. Acts as contact point between the Construction sites and the Head
Office.
6. Notifies of investments and/or disinvestments required for work
programs, especially further the Direct Hiring activities.
7. Ensures the correct use of assigned technical resources and implement
the appropriate procedures in collaboration with the relative Company
Unit.
8. Fosters a genuine HSE culture within the Construction Management
Staff.
9. Ensures the preparation of Project completion reports with all
required data for future use of Company Units.
10. Proposes to the BU Manager the candidate Site Manager and/or
Construction Managers Onshore for acquired Projects, as well as the
Project Construction Lead during the preparation phase.
Back to Top |
|
Deputy
Project Manager - Nigeria - Job No. 2497 Listed 17/1/12
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY (DAILY) GBP 480 per day of work
OVERTIME Included in the monthly rate
ACCOMMODATION Single Accommodation provided by company together with
full boarding
TRANSPORTATION Rotational flights provided by company (economy)
INSURANCE D&D USD 300’000
LIFE INSURANCE USD 200’000
MEDICAL Worldwide Medical Protection
ROLE
DESCRIPTION
70 Km x 24" pipeline project
Family
Co-ordinates the execution of the Construction activities, procedures,
flow of information and interfaces within the specified area of
competence, ensuring Company economic and strategic results and the
observance of HSE and Quality procedures and practices.
1. Maintains relationship with the Project Teams, other Departments and
Clients (as the case may be) operating in the field of expertise he's in
charge of.
2. Collaborates with the Commercial Function during the estimating,
tendering and budgeting phase and require assistance from Commercial
Department during construction for contract interpretation.
3. Draws up the Projects’ schedule and the Construction strategy
within the specified area of competence and identify human resources and
equipment requirements. Defines the time and costs required for
fulfilment of established objectives.
4. Co-ordinates Construction execution activities and constantly monitor
economic-operative progress by analysing any deviations from the program
and implementing the necessary corrective action, providing support to
the Project Manager and Project Director.
5. Acts as contact point between the Construction sites and the Head
Office.
6. Notifies of investments and/or disinvestments required for work
programs, especially further the Direct Hiring activities.
7. Ensures the correct use of assigned technical resources and implement
the appropriate procedures in collaboration with the relative Company
Unit.
8. Fosters a genuine HSE culture within the Construction Management
Staff.
9. Ensures the preparation of Project completion reports with all
required data for future use of Company Units.
10. Proposes to the BU Manager the candidate Site Manager and/or
Construction Managers Onshore for acquired Projects, as well as the
Project Construction Lead during the preparation phase.
Back to Top |
|
Site
Manager/Construction Manager - Nigeria - Job No. 2536 Listed 17/1/12
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY (DAILY) GBP 550 per day of work
OVERTIME Included in the daily rate
ACCOMMODATION Single Accommodation provided by company together with
full boarding
TRANSPORTATION Rotational flights provided by company (economy)
MEDICAL Worldwide Medical Protection (also covering the wife and kids
under 18)
Mandatory
At least 5 years experience as a Site Manager on O&G Projects above
$100 million
Extensive (15 years) O&G EPC experience in a supervisory role i.e.
Area Supt or above.
Manage subcontractors and demonstrate proven experience of the same.
Good communicator and Leader
Motivated
Committed
Preferred but not essential Nigerian experience
70 Km x 24" pipeline project
He manages and superintends site activities regarding construction,
pre-commissioning, start-up and handing over of the plant to the Client,
so as to satisfy the contractual obligations and targets fixed by the
Project Manager.
He manages also the construction works carried out by the Contractors,
ensuring that the time, cost, quality, safety and environmental
requirements of construction activities are meet.
Representing the company at site and conferring with Client and local
authorities for all site related activities and problems
Approving the HSE procedures for Construction and commissioning,
ensuring their implementation
Ensuring the planning, scheduling, and feasibility, availing himself of
the expertise of site organization key positions.
Ensuring the application and, where not already arranged in the planning
phase, the issue of suitable procedures for the definition of working
methods and site regulations
Ensuring the implementation of the Site Quality Control Plan
Checking that he procedures defined for site activities are applied.
Ensuring site logistics, also by purchasing the materials and services
necessary for efficient site operation, within the limits of the
assigned power and in accordance with Company procedures
Ensuring compliance with the local laws and regulations.
Checking construction progress on a weekly basis, identifying any
problem areas and requesting the Contractor involved to take action,
where required 10) Ensuring the preparation of work progress reports
Ensuring the achievement of the mechanical completion objective
Ensuring the management of pre-commissioning activities, availing
himself of support from Commercial.
Ensuring the issue of the Certificates of Completion required by
contract 14) Ensuring the issue of the plant taking-over certificate
Back to Top |
|
Pipeline
Spread Superintendent - Nigeria - Job No. 2498 Listed 21/12/11
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY (DAILY) GBP 400 per day of work.
OVERTIME Included in the monthly rate
ACCOMMODATION Single Accommodation provided by company together with
full boarding
TRANSPORTATION Rotational flights provided by company (economy)
INSURANCE D&D USD 300’000
LIFE INSURANCE USD 200’000
MEDICAL Worldwide Medical Protection
ROLE
DESCRIPTION
Family
1) Implements pipeline installation works.
2) Supports the construction manager in the definition of the execution
strategy of construction works.
3) Co-ordinates all interdisciplinary field works on a site, supervising
the various disciplines/categories of construction and assembly work.
4) Co-ordinating Detail Programs for work carried out directly and works
handled by subcontractors, solving contingent problems on site and
optimising the use of materials, work teams and available equipment.
5) Solves co-ordination and interface problems with the Client. Managing
the different work activities.
6) Monitors Works Assistants to ensure their correct supervision of work
and to provide Foremen with the necessary capabilities in order to carry
on the activity, in compliance with established program, progress and
costs objectives, as part of a wider objective to optimise manpower.
7) Monitors Works Assistants to ensure the correct implementation of
construction activities in compliance with quality standards and
requirements.
8) Assists the Construction Manager in the solution of technical and
management problems within the assigned area.
9) Assists the Site Project Control Engineer with the preparation of
periodical reports, and supervising the correct implementation of
procedures designed to collect work performance control data.
10) Supervises the work measurement in order to prepare the work
progress report. Organises and implements works on site, including
coordination and supervision; ensurse efficient levels of performance,
minimises costs and meets established deadlines, projects
specifications, ensuring the respect of HSE and quality procedures and
practices. Planning & Control (of the Objectives)
Back to Top |
|
Project
Engineering Manager - Nigeria - Job No. 2624 Listed 21/12/11
12 months (renewable)
Consolidated Daily for days worked only 450 GBP
Overtime included in daily salary
Rotation 75 / 21
10hrs a day 6 days a week
Single Accommodation provided by company together with full boarding
Full medical insurance
Must have at least 5 years Oil and Gas experience
Must have at least 3 years experience in this position
For Superintendent, Coordinator and Manager positions you must have at
least 5 years experience
Diploma’s would be preferred in the area of the position
See 2499 below probably same job
Back to Top |
|
Field
Engineering Manager - Nigeria - Job No. 2499 Listed 21/12/11
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY (DAILY) GBP 450 per day of work
OVERTIME Included in the monthly rate
ACCOMMODATION Single Accommodation provided by company together with
full boarding
TRANSPORTATION Rotational flights provided by company (economy)
INSURANCE D&D USD 300’000
LIFE INSURANCE USD 200’000
MEDICAL Worldwide Medical Protection
ROLE
DESCRIPTION
Family
Manages and supervises the engineering activities to support the
construction work and to define the solution of engineering problems
arisen during construction.
A - Development Technology know how & Commercial support
B – Feasibility
C - Bidding phase / Commercial proposal development
D - Project Execution
1) Participate to Detail Engineering Phase for Construction related
issues;
2) Prepares the Field Engineering Execution plan and defines the
necessary resources. Identifies the planning issues in terms of field
engineering; E - Construction & start up
1) Ensures the interfaces with the Construction team ( HSE, Construction
Engineering, Site material management, Quality Control, Construction
Supervision and Commissioning & start up) and assist it as needed;
2) Manages the site queries including material substitution. Reverts to
the Head Office or Site Engineering Team when needed for securing the
technical answers;
3) Keeps record of the changes and additions made to the documents as a
result of construction and commissioning requirements until the "as
built" drawings are prepared;
4) Check the conformity and congruence of technical documentation
received from Head Office making it available to the Discipline
Superintendent;
5) Ensures the analysis of engineering, materials and construction
nonconformities encountered on site assuring the involvement of the
competent Head Office department in the determination and approval of
corrective action;
6) Analyses the technical aspects of the feasibility of the construction
work, providing information on the actual on-site availability of
documents and materials;
7) Coordinates the engineering activities for site procurement;
8) Send for approval to the competent Head Office department proposed
7) Coordinates the engineering activities for site procurement;
8) Send, for approval, to the competent Head Office department proposed
design modifications before carrying out the work;
9) Coordinates Field Specialist Engineer activities in relation with
changes to technical documents, feasibility technical analysis, non
conformities, review and approval of test packages;
10) Ensures interface with vendor's representatives together with the
relevant Field Specialist Engineer or Discipline Superintendent;
11) Collaborates with Construction Manager to plan the material
collection from warehouse, evaluating the need to purchase in case of
shortage;
12) Activate back charge notifications to vendors.
Back to Top |
|
Field
Engineer - Nigeria - Job No. 2625 Listed 21/12/11
12 months (renewable)
Consolidated Daily for days worked only 330 GBP
Overtime included in daily salary
Rotation 75 / 21
10hrs a day 6 days a week
Single Accommodation provided by company together with full boarding
Full medical insurance
Must have at least 5 years Oil and Gas experience
Must have at least 3 years experience in this position
For Superintendent, Coordinator and Manager positions you must have at
least 5 years experience
Diploma’s would be preferred in the area of the position
Back to Top |
|
Lead
Pipeline Engineer (Onshore) - Abu Dhabi - Job No. 2606 Listed 11/10/11
Lead Pipeline Engineer (Onshore)
Location AE - Abu Dhabi Abu Dhabi
Description
Be the Lead Pipeline Engineer on the project related to on-shore
pipelines systems and to provide guidance and technical advice to the
Pipeline Engineering team
Specific Accountabilities
Site visit / Survey and Data Collection
Pipeline route reconnaissance
Pipeline Mechanical Design Calculations (e.g. Wall Thickness, Crossing
Design etc).
Preparation of Materials Specifications and Data Sheets
Provide necessary inputs to Designers for preparation of various
layouts, detail drawing, MTOs
Ability to undertake Stress / Flexibility Analysis.
Knowledge of selection of materials.
Review of other discipline deliverables for interface checking, inter
discipline co-ordination activities etc.
Technical assistance to designers
Preparation of Material Requisitions (MRs) also called as RFQs
(Requisition of Quotation)
Evaluation of Technical Quotations / Offers submitted by the Vendors
Raise Technical Queries (TQs) if any, to the respective vendor for
clarifications.
Prepare Technical Bid Evaluation (TBE) table & TBE report.
Prepare Purchase Requisition / Order
Review of Vendor Data / Drawings and approval of the same.
Experience of having lead a couple of large sized projects (above 5000
man-hours for Pipeline).
Participation in Value Engineering Workshops, Preparation of CTRs (Cost,
Time and Resource requirement estimates on assigned projects, manage
design change within Project budget and schedule frame work, Manager
project discipline resource requirement, effective interaction with
client engineering team, Ensure compliance with the work scope etc.
Excellent communication, Leadership & Supervision skills.
Quality Assurance – Responsible for working within the provisions and
guidelines of the Quality Assurance system
Safety – Responsible for personal safety safe working practices.
Requirements Essential Skills/Experience
Degree in Mechanical Engineering relevant field.
At least 12 years in Onshore pipeline system design and engineering in
consultancy organisations.
Sound experience in Conceptual, FEED, Detailed Engineering and
Procurement of onshore pipelines system encompassing pipeline design
engineering tasks.
Experience for Industry standard codes and analysis softwares.
Ability and willingness to meet agreed deadlines.
Well developed report writing skills.
Desirable:
Knowledge of GIS, Extensive work experience at a very senior level
within Engineering Consultancy organisation.
Back to Top |
|