Commissioning, Turnover & Shutdown

Back To Main Menu

Click on any job in this list or scroll down the page to view all

Commissioning Manager (PMC)-Experience in Material Handling Plant - Abu Dhabi - Job No. 2690 Listed 25/5/12
Commissioning Manager - Nigeria - Job No. 2653 Listed 15/3/12
Commissioning Manager PMC - Abu Dhabi - Job No. 2618 Listed 29/11/11
UK below this point

                

Back to Top

Commissioning Manager (PMC)-Experience in Material Handling Plant - Abu Dhabi - Job No. 2690 Listed 25/5/12

SCOPE OF RUWAIS SULPHUR HANDLING TERMINAL
The Sulphur Handling Terminal–2 (SHT-2) Plant facility will be a new green field plant located in the Ruwais industrial area approximately 165 km west southwest of Abu Dhabi City.
Granulated sulphur will be transported by rail from Habshan and Shah areas to a new Sulphur Handling Terminal (SHT-2) located approximately 4.5 km southeast of the existing Sulphur Handling Terminal (SHT). The SHT-2 facility is designed to receive 22,000 tonnes per day of granulated sulphur.
PROJECT involves the rail unloading, granule storage and ship loading of elemental granular sulphur from railcars, and the supply of utilities from existing facilities within the Ruwais industrial area. The facilities located at the new Sulphur Handling Terminal Facility will include:
Rail Unloading
Solid Sulphur Granule Storage, Stacking and Reclaim Facilities
Conveying Systems
Ship Loading Systems
Utility and Offsite Units to support the Rail Unloading, Storage, and Ship Loading Facilities
Granulated sulphur unloaded from railcars is stacked / reclaimed from the storage buildings, and then transported by conveyors to one of the two quadrant style ship-loaders for discharge into ships for export to market.
We will provide PMC services for the EPC phase of the project. The work will include engineering, procurement, construction, COMMISSIONING, TEST RUN to achieve PROVISIONAL ACCEPTANCE followed by WARRANTY PERIOD and to achieve FINAL ACCEPTANCE.
Requirements
Qualifications:
Degree in Chemical, Mechanical or Instrument Engineering from a reputed institution
Experience:
Minimum 20 years of total exp
Commissioning experience on a Material Handling Plant is a must.
1.Start-up, commissioning or operations experience in a solids handling plant, like sulphur granules, limestone granules, metal ores, etc.
2.Experienced in Railcar unloading, continuous or stationary
3.Experienced in Ship loading and terminal
4.Experienced in Stacker Reclaimers
5.Experience with dust scrubbers
6.Experienced in PLC and SCADA systems
7.Experienced in DCS systems, preferably Honeywell

Back to Top

Commissioning Manager - Nigeria - Job No. 2653 Listed 15/3/12

Location Nigeria, north of Port Harcourt
Project description:
50 km pipeline 24" plus above ground facilities with:
Slug catcher, 3 Lp pressure vessels
Gas heater
Possible stabilization unit
Metering skids
Telecom system wifi and with fiber optic
water treatment plant
gas/diesel generation
Firefighting network = F&G
ESD+ DCS to be commissioned
2 block valve stations
For this position Western resources are required.
LOCATION Onshore Nigeria
START ASAP
DURATION 12 Months renewable (Standard)
ROTATION 75/21
WORKING DAYS/HOURS 10 hours per day / 6 days per week
SALARY (DAILY) GBP 550 per day of work
OVERTIME Included in the monthly rate
ACCOMMODATION Single Accommodation provided by company together with full boarding
TRANSPORTATION Rotational flights provided by company (economy)
INSURANCE D&D USD 300’000
LIFE INSURANCE USD 200’000
MEDICAL Worldwide Medical Protection(also covering the wife and kids under 18)

Back to Top

Commissioning Manager PMC - Abu Dhabi - Job No. 2618 Listed 29/11/11

7 months duration
Accommodation site based
3 air tickets per year to place of origin.
Basic salary circa US Dollars 12,000 per month plus overtime circa 3000 USD per month.
Currently chasing client for details of salary, accommodation and rotation. When they respond all details will appear on this web site
Description Project Scope
Project Management Consultancy (PMC) Services for the EPC phase of a project where the Client intends to install a new Booster Compressor Station. Client also intends to make modifications and minor changes to existing plants. Front End Engineering Design (FEED) has been completed and the EPC Works of the project will be tendered on competitive basis and will be implemented on Lump Sum Turnkey Basis.
The project includes Project Management Consultancy (PMC) Services for the following:
New Booster Compressor Station:
Three 40% booster compressors driven by electric motors. Each compression train includes dedicated supporting equipment (recycle-coolers, knock-out drums, etc.) in-line separators for the HP and IP transfer lines,
Transfer lines (Approximately 3 km each) for HP, IP and LP and LGR( Lean Gas Recycle) / Fuel gas pipeline line (Approximate size 12"-15 km) with pigging facilities
A new substation and control console including integration to the future DCS.
Utilities and offsites to support new equipment,
Demolition of existing booster compressor station and associated facilities.
Minimum De-Bottleneck of existing plant:
The minimum de-bottleneck case covers modifications to allow the processing of additional feed gas with minimum expenditure of capital cost and requires the following:
A new parallel Feed Gas Compressor along with Suction Drum, after-cooler.
A third parallel IP Gas Interstage Drum Pump.
A new parallel LP Gas Compression train.
The addition of a third Vapour Dehydrator and minor modifications to the existing two Vapour Dehydrators.
New parallel second Vapour Dehydrator Outlet Filter, new parallel Separator upstream of the Vapour Dehydrators, new regeneration gas heater that would replace the existing one, parallel Coalescer, parallel Expander Outlet Drum Pump, Retraying of the Demethanizer etc.
A new Expander Compressor that would replace the existing one.
A bypass line to divert a portion of the gas leaving Separator No. 2 around the turbo-expander and demethanizer.
Replacement of some instrumentation.
Utilities and offsites to support new and modified equipment:
32 MW substation, Overhead Transmission Line (Approximately 10 Km).
New set of air Compressors and driers
Closed drain system
Related Electrical, Instrumentation, Civil and other works
Miscellaneous other minor changes to support the higher feed gas throughput:
Equipment modifications such as exchanger nozzles replacement, Vessel internals replacement, Control Valves, Flow instruments, Line sizes etc.
Divert Feed Gas form one existing plant to another
The following major equipment/modifications are considered:
A new HP Gas Compressor.
A new Liquid Diversion Drum and Liquid Diversion Pump.
A new 10 km 16° pipeline to divert this compressed gas.
A new HP Separator.
Requirements Experience: Minimum 20 years
Qualifications: Engineering degree Mechanical I Chemical from a reputed institution

Back to Top

UK below this point